Agenda & notes for 9/5 meetings:
·
AR reviews (Cindy)
·
non-OpenStack patch analysis sharing (Saul)
·
CentOS 7.5 upgrade & test status (Shuicheng, Ada)
o
Ceph package upgrade status (Vivian)
o
Story:
https://storyboard.openstack.org/#!/story/2003605
·
Open topics (Brent, Saul?)
Agenda & notes for 8/29 meetings:
·
Review Team objectives & prioritize (Cindy)
Review team goal. Concern about the % patch reduction by 50% and 90% by mid of 2019 and end of 2019. Saul: define a more realistic # after patch review.
·
CentOS 7.5 upgrade status (Cindy)
most of sRPM upgrade patches has been merged into f/centos 7.5 branch; 5 to be merged: 2 patches is under review, 1 in progress. 2 patches causes basic deployment
issues: lighttpd (https://review.openstack.org/#/c/596263/) & python-eventlet-0.20.1-2.el7.src.rpm (patch# TBD);
plan is to keep the SRPM in 7.4 w/ other sRPM for a test build to GDC and WR.
Trending: end of Friday China time for test build; ISO to GDC, build instructions (including pending patches if needs to be cherry-picked), branch-name. Shuicheng
will send this out.
·
OS kernel version upgrade: can we upgrade to another kernel (to be planned).
Code freeze for 2018.10: Sep 26th.
AR: Shuicheng file a story for OS kernel upgrade into 7.5 kernel.
·
Out of tree kernel driver is part of the scope?
AR: Shuicheng to scope what is the kernel drivers needs to be upgraded
it's OK if we cannot hit Sep 26 code freeze date.
·
Ceph package upgrade (Vivian Zhu is working) - part of storage team.
AR: Cindy to invite Vivian into this meeting to provide the status update.
recommendation from Brent: very high risk of upgrading Ceph to hit Sep 26th code freeze date.
·
libvirt and qemu upgrade status (Ghada)
Jim has a basic build for libvirt w/ patch rebase. Finishing Qemu trending end of this week. will be off next week.
Patch will not be merged before WR internal testing, will be merged before Sep 20th?
·
non-OpenStack patches review status (Saul)
master xls: https://docs.google.com/spreadsheets/d/1nKnkweuxcqvVOoRcpnTYMVUUv1RoAugOWXMjB7VIrfc/edit?usp=sharing
Intel or gmail address to Bruce if you'd like to get access.
Goal: to get 1st pass of analysis results by PTG (Sep 12th)
·
2018.10 release content review (Ghada)
·
OS independent topics (Saul) - defered
EOM