8 Oct
2018
8 Oct
'18
8:26 a.m.
Hi all I have a test scenario where requires a controller locked/disabled to be powered-off by command ' system host-power-off <controller name/id> ' , currently on Duplex (redundant) configuration that is rejected with below message, is that normal behavior? Else I will open a Launchpad. ======= " Operation Rejected: Request rejected due to provisioning semantic check. . Please verify that the board management MAC or IP address being used is formatted correctly or not already provisioned against another host. " Regards, José